
 
Model:CP-96,CP-72
Specification:
Voltage:150-500V
Working Time:not longer than 5 minutes
This indicator is designed for easy testing of phase sequence in three-phase systems with a permissible operating voltage up to 500V.For short connections,not longer than 5 minutes for one test,a push-button swith is placed on the front plate.A disc with an indicating arrow rotates in the direction of the arrow if the three phases are properly connected,otherwise the disc rotates in the other direction.By changing of two wires,the phase sequence will be corrected to corresponding designation of the terminals;
YUEQING LEYI ELECTRIC CO., LTD.
TEL:0086 577 62578091(5 LINES)  FAX:0086 577 62576780
salzer@salzer-electric.com